AI Calculator—Solar PV Installation Calculator
How does it work?
From annual electricity consumption to a PDF estimate
Describe the job
Power in kWp or annual consumption from the bills, roof type and battery. From the description, AI fills in the job type and the template’s questions.
Check the items
PV kit and installation per kWp, design and grid operator notification, fire safety approval above 6.5 kW, battery per kWh.
Send the estimate
Equipment and labor in separate tabs, travel per km and the “Audit, power sizing and on-site estimate” item at a price of 0. A PDF estimate for the client.
What the work looks like in the app
Real screens from a sample apartment estimate, with made-up client details.
The app is in Polish today, so the screens below are Polish. An English version is in preparation.
You describe the job, AI sets up the project
Type in what needs doing. AI sets the power in kWp or the annual consumption, the mounting location, the battery and the job type, and you see the equipment and labor amounts straight away.
- Every parameter AI set is marked
- Click it and correct it before the estimate goes to the client

Labor with working time
Each labor category has an amount and a number of crew working days, and you decide whether the client sees the time. Next to it you see the equipment and labor summary. Items you repeat can be saved in your own library (in PRO for companies) and added to your next project.

You decide what the client sees
Choose what goes into the estimate and which details to show: items, completion time, price notes. The PDF goes out with your company's details.


Sharing and export
Access for a chosen person: read, edit or admin. The public read-only link is in PRO for companies. Export to PDF and XLS, and a company account can also upload its own price list from an .xlsx file.


Your company page in the directory
Build your company page from ready sections: about, location, services, projects and reviews.

On site from your phone
It is the same app: the project, the list of jobs and item details without a laptop.


What the calculator gives a solar PV installer
Net starting prices and VAT 8% (residential building within the floor-area limit). A ground-mounted installation without a building or one for a business is usually 23%—you change the rate and every price manually.
Power from the bills
When the client gives only the annual consumption, the power is 1 kWp for every 1,000 kWh of annual consumption. With no data in the description, the template assumes 6 kWp.
Mounting location
A separate installation rate per kWp for metal roofs, tiled roofs, flat roofs and ground mounts. Ground mounts add a surcharge for the structure.
Paperwork
Design, grid operator notification, AC/DC switchboard and grounding in one item. Above 6.5 kW, approval by a fire safety expert is added.
Battery and extras
Battery per kWh with installation and a hybrid inverter, optimizers for each panel, an EV charger with its circuit—each as a separate item.
Servicing without a new installation
For an existing system: a battery per kWh of capacity with installation and swapping the inverter for a hybrid one. Servicing covers a technical inspection and panel cleaning.
Client’s own equipment
The client already has panels and an inverter? The template keeps installation and paperwork, without the PV kit.
Sample jobs
Typical jobs and how the calculator sets them up. You set your own prices.
House, 6 kWp on a metal roof
The client writes “6 kW solar on the roof”. The template counts the PV kit and installation for 6 kWp, plus the design with the notification.
10 kWh battery for an existing system
The client adds a battery to an 8 kWp system. The template counts the battery per kWh with installation and commissioning, and replacing the inverter with a hybrid one.
Inspection and cleaning of 16 panels
Job type “servicing”: technical inspection of the system and panel cleaning charged per piece.
Try it on your own project
Describe the job or add a photo of the floor plan. Your first AI analysis costs nothing, and you see the full estimate in PRO.
Works with the other tools
Data moves with one click. Each tool also works on its own, and nothing is saved without your say-so.
Contract and estimate with the project data
Open the document generator from the project menu. Client, address, scope and amounts are already in. Send the contract to the client to sign online, and after the job prepare an acceptance report, plus an addendum when the scope changes.
Open

Acceptance report after the job
Below the contract in the generator, choose a work acceptance report or a contract addendum. The parties, address and contract date carry over on their own, and the client signs the report on the screen.

- Chrome extension

A product from a shop straight into the estimate
The Chrome extension takes what the shop gives—usually the name, photo and price—from the shop page into the project and room you choose. Whatever the shop does not give, you select on the page and say what it is—a name, a price, a dimension, a color, a finish, a material, a catalog number, the manufacturer or the supplier. In October 2026 we checked it on 24 Polish online shops; it is not limited to selected partners.
Open - Document generator

A QR code on the contract from the generator
The PDF ends with a QR code. Your client checks with a phone that the PDF file is the same document as the printout.
Open - Document generator

From a free calculator to an estimate
One click turns the paint or tiles calculator result into an estimate in the document generator.
Open
In preparation
Not there yet. This is how it is meant to look, so you know where this is going.
- Visualization—in preparation
Price updates through the Chrome extension
Refresh the price of a product added from a shop right from the project.
- Visualization—in preparation
Large estimates in the generator
All your pricing, with every item, will go into the estimate, not just the category totals.
Five tools, one renovation
Each one works on its own. Together they pass data along so you never retype it.
Room planner
Floor plan with room areas, 3D view
Chrome extension
Products from shop pages: what the shop gives
Renovation Calculator AI
Labor and materials priced from the client's description
Document generator
Contract, estimate, online signature, QR code
Free calculators
Paint, tiles, wall colors
- Chrome extension : Renovation Calculator AIa shop product goes into the projectWorks today
- Renovation Calculator AI : Document generatorcontract and estimate with project dataWorks today
- Free calculators : Document generatorpaint or tiles result as an estimateWorks today
- Renovation Calculator AI : Room planneropen the planner from the project menuWorks today
- Room planner : Renovation Calculator AIrooms with floor area and perimeterWorks today
- Room planner : Renovation Calculator AIinstallations from the plan into the estimateIn preparation
- Renovation Calculator AI : Chrome extensionproduct price refreshIn preparation
The full estimate
Every category and amount, with no hidden items.
Estimate settings
Scope of the estimate, details the client sees, and the PDF template.
Project sharing
Access for a chosen person: read, edit or admin. The public read-only link is for companies.
Duplicate projects
Copy a project and choose what comes along: quantities, photos, notes.
Margin, discount and VATfor companies
Set separately for furnishings, materials and labor—or on a single item when you want an exception.
Your own formulasfor companies
Change how an item is calculated, e.g. the amount of material per meter.
Company page in the directoryfor companies
Your company profile in this site's company directory, with projects and reviews.
Questions about pricing solar panels
How does the template size the installation?
1 kWp for every 1000 kWh of yearly power use. When the description gives neither the use nor the power, the template prices 6 kWp. You change the power in the template questions.
Does ground mounting cost the same as roof mounting?
No. Installation per kWp depends on the place: a metal roof, a tiled roof, a flat roof or the ground, where a mounting frame is added.
What about the design and the grid operator notification?
The design, the notification, the switchboard with protections and the earthing are one item. Above 6.5 kW the template adds the fire safety expert’s approval of the design.
Can the template price a home battery?
Yes. A home battery, optimizers and an electric car charger are separate items in the template.
What VAT rate do solar panels have?
The template uses 8%, as for an installation on a residential building. You change the rate in the project; if in doubt, check it with your accountant.
Join Our User Community
Have questions? Join our community of renovation calculator users and share your experiences.

